Resources required can range from just a few days of effort to several months or years. There are a number of variables impacting this, including:
As a general rule of thumb, the “Difficult” category of network analysis conducted on a longitudinal basis will require overall resources similar to that of an impact evaluation. Time estimates given above start with research design and conclude with submission of SNA report.